Repairs should only be carried out by geofennel authorized workshops. One is an optical plumb bob, and the other is a laser plumb bob. Set up the tripod legs, taking care to set the height where the instrument sight will be at a comfortable eye level. A little scope is located at the lower part of the theodolite.
Wild heerbrugg t2 theodolite eyepiece set, for highelevation sightings. The traditional use has been for land surveying, but they are also used extensively for building and infrastructure construction, and some specialized applications such as meteorology and rocket launching. In its modern form it consists of a telescope mounted to swivel both horizontally and vertically. Drive the tripod legs into the ground using the brackets on the sides of each leg. This instrument plays a major role in measurement horizontal angles, vertical angles, bearing, etc. The optical plummet is located in the alidade so that it rotates with the instrument and provides an erect image with a focussing range of 21 to 50 feet. Jpg which uses an internal file numbering sequence that theodolite keeps track of in this case, its image 163. The pibal theodolite uses a prism to bend the optical path by 90 degrees so the operators eye position does not change as the elevation is changed through a complete 180 degrees. Support centring screw it with one hand and insert and tighten the. Release the upper clamp and direct the telescope approximately towards the point p. With the help of upper clamp and tangent screw, set 0. Choose tools protect more options encrypt with password.
Theodolites are essential surveying instruments used for the measurement of horizontal and vertical angles. Plumb bob method i setting up the tripod this is the most important operation. Setting up omnistar follow the omnistar instruction manual and establish the antenna over the point. It is a precise and timeconsuming process, learnt in part by experience and in part by theory. Builder, station setup, for builder 200 or higher 9. Theodolite, basic surveying instrument of unknown origin but going back to the 16thcentury english mathematician leonard digges. Theodolites how does a theodolite work theodolite vs transit. Surveying instruments theodolites bright hub engineering. It is a tool used in the land surveying and engineering industry, but theodolites have been adapted for other specialized purposes as well. Set up the instrument over o and level it accurately. During the course of training for the practice of land surveying, the surveyor candidate or student will be trained to set up a theodolite.
Among other information, the manual contains basic instructions for operation of the instrument and describes recommended servicing and adjusting methods. File type pdf wild t theodolite manual engineering level a brief how to video on setting up a level and rod. Through the scope, locate the rebar or point of beginning. The lower clamp is kept fixed and upper clamp is loosened. Here in we have gathered some pdf lectures on surveying. Mark the point at which the theodolite will be set up with a surveyors nail or a stake. Measurement of horizontal angle measurement of angle abc the instrument is set over b. Chapter 3 surveying equipment, measurements and errors. Theodolite surveying surveying scientific observation.
Leveling systems are fitted for accurate installation of theodolites. The balloons are carefully constructed and filled, so their rate of ascent can be known fairly accurately in advance. Pdf how to use the theodolite for vertical and horizontal. Temporary adjustment the adjustments are made at each set up of the instrument before we start the observations with the instrument is known as temporary adjustment. We hope students all over the world will find it helpful. This is likely the most compatible across all platforms, as it conforms to traditional 8character photo filename conventions for digital cameras. You will be using a universal theodolite, model wild t2, for these measurements. Hanging file centers hanging clamps blueprint wall racks blueprint file storage cabinets steel flat files. Do not remove warning labels or safety instructions. Corporate office trimble navigation limited documentation group 645 north mary avenue post office box 3642 sunnyvale, ca 940883642 u.
Open the pdf in acrobat dc, and do one of the following. Transit theodolite tripod and ranging rods procedure. Surveying by using digital theodolite linkedin slideshare. To use theodolite, it is necessary to know about theodolite parts, types of theodolite and for what it is used wisely in the field. The theodolite is typically mounted on a rugged steel stand, set up so it is level and pointed north, with the altitude and azimuth scales reading zero degrees. Wild heerbrugg t2 mod user manual pdf file in english or. If the tripod is not set properly, a great deal of time will have to spent on subsequent operations 2 to 4. Surveying is a very important part of civil engineering. Now, and only now, place the instrument on the tripod and secure it with the central fixing screw. This distance will most likely change every time you set up your theodolite at the station and must be updated accordingly. Connect the data cable from omnistar to the coms port on your computer.
Digital theodolites consist of a telescope that is mounted on a base, as well as an electronic readout screen that is used to display horizontal and vertical. Leveling the total station leveling the total station must be accomplished to sufficient accuracy otherwise the instrument will not report results leveling the instrument takes 30 to 45 minutes make sure you can see all targets from the instrument station before going through the process. There are various modes of constructing theodolites to suit the. Drive a surveyors nail into the ground at the point where you want to set up the theodolite. Lab instructor will demonstrate setup and operation of the theodolite. Set the back up offset hub as far back as possible staying inside of right of way. Edm and electronic theodolite edm and electronic theodolite 33. Spring 2016 field book university of colorado boulder. Total station setup and operation university of south alabama. Measure the height between the ground and the instrument. Many times the offset hubs are destroyed accidentally during the construction of the slopes and all references to centerline are lost. It is a basic course for all universities for civil engineers. If you receive a prompt, click yes to change the security. Way more information than you ever wanted on how to fell a tree.
Support centring screw it with one hand and insert and. Theodolites, land surveying theodolites, land surveying. The ts100 total station provides superior performance at an unbeatable price for survey and construction applications. Level the instrument at a site where the target can be viewed through the telescope and the mirror target can be setup. This document pdf may be used for research, teaching and private study purposes. Theodolite, tripod, rod, plumb bob, and field book lab procedure centering our theodolites have two types of centering features.
A theodolite is a precision instrument for measuring. Wild heerbrugg t2 mod user manual pdf file in english or german. Other specialized purposes make theodolites ideal for shop and. Created at and for mohawk college in hamilton, ontario, canada. Its built tough to survive in extreme conditions, yet easy to set up and put to work quickly. Wild t2 universal theodolite, the bestknown singlesecond instrument in the world. The ts100 features 200m reflectorless operation and up to 2000m using a single prism.
The centered hole of the mounting plate should be over. Set up the tripod so that the tripod plate is as horizontal as possible and the legs of the tripod are firm in the ground. Most likely you have knowledge that, people have look numerous times for their favorite books taking into account this wild t1 theodolite manual, but end up in harmful downloads. Wild t2 mod user manualdescribsion beschreibung wild heerbrugg ag wild t2 mod theodolite user manual. The art of setting up a theodolite over a station up the instrument 8. Setting up a theodolite or total station is an integral part of good surveying practice following a simple process. Using the provided transit or theodolite set up the instrument over a point assigned by the instructor. Theodolite parts and its functions for measurements in surveying. This point is the basis for measuring angles and distances. Set up the theodolite sight the initial point and read the direction e. Theodolites are similar to total stations, except that the total stations are used when the distances. Support centring screw it with one hand and insert and tighten the centring screw with the other.
Mar 18, 2015 setting up a theodolite or total station is an integral part of good surveying practice following a simple process. Access free wild t1 theodolite manual wild t1 theodolite manual thank you completely much for downloading wild t1 theodolite manual. Surveying instruments and technology theodolites routledge. The theodolite helps us a good within the engineering field.
Use one of the chosen points as starting point as a reference. A theodolite is a instrument for measuring both horizontal and vertical angles, as used in triangulation networks, and geolocation work. Make sure the height of the tripod allows the instrument the theodolite to be eyelevel. A balloon is released in front of the theodolite, and its position is precisely tracked, usually once a minute. Sep 25, 2012 adjustment of the theodolite temporary adjustment setting up the theodolite 16. Theodolite vs transit how to use a theodolite how a theodolite works. The first is a sequential file name, which is an 8character name like th000163. This video will give you a very basic idea of the process, but there is a lot more to learn. Choose file protect using password, and then choose advanced password protection from more options. Angles will be measured from this point, as will distances. Choose four other different points around 3600 sweep.
If everything is set up properly various figures should start. Then im going to set the instrument up at 90 degrees and were going to measure a vertical angle to the corner of the roof. Theodolites how does a theodolite work theodolite vs. Set a second back up offset hub and lath for line and distance to centerline only, well beyond the original offset in fill sections. With the optical plummet, the theodolite can be set up quickly regardless of wind condi tions or vibrationsthereby greatly reducing the time required to plumb the instrument. The latest theodolites have infrared distance measuring devices, for which regular infrared inspection is essential. Mount the theodolite by placing it atop the tripod, and screw it in place with the mounting knob. Levellingup the instrument after setting up the instrument, level it up approximately with the bullseye bubble. Set up the theodolite on the tripod at the distance of 2. Theodolite setting up the theodolite the sequence of operations required to prepare the instrument for.
721 1286 1067 283 1530 1589 710 1167 1439 1098 1444 181 171 1008 1466 1557 1375 1383 1135 24 981 1237 581 500 1567 1021 215 964 677 790 584 229 1002 1112 1114 202 768 859 145 XML HTML